216.73.216.70rmote
Telecom e-Services
Beta
DOT Mitra

After the feasibility confirmation from the agency/authority, User can proceed for payment.

4MB

Compensation charges for usages of street furniture for \r\n installation of telegraph line is Rs100/annum/street furniture

No charges for installation of small cell and telegraph line \r\n on the immovable property under control or management of \r\n appropriate central authority only a copy of certification by a \r\n structural engineer authorised by appropriate authority, attesting \r\n to the structural safety of the street furniture where installation of \r\n small cells and telegraph line is proposed to be deployed, to the \r\n appropriate authority for permission to use street furniture for \r\n installation of small cells and telegraph line.

Rs 1000 per pole as administrative charges for installation of small cells and telegraph line.

Yes he can establish pole at any public land for deployment of small cells \r\n In order to provide high quality customized 5G services

“Small Cell” means a low powered cellular radio access node that has a \r\n coverage of distance from ten meters to two kilometres.”.

Pole” means any above-ground contrivance of height not exceeding \r\n eight meters for carrying, suspending, or supporting a telegraph and does not \r\n include mobile tower.

- Compensation charges for usages of street furniture for installation of small cell is Rs 300 /annum for urban & Rs 150/annum for rural

5G small cells have limited coverage of tens/hundreds of meters and \r\n are mostly marked by short ranges and may however vary significantly \r\n depending on their use cases. Considering the need for densification of the \r\n network, these small cells will be deployed on various types of streets \r\n furniture such as poles, streetlights, traffic lights, bus stop shelter, \r\n advertisement hoardings, billboards, etc

In GatiShati Sanchar Portal service provider can avail the features of GIS mapping of existing mapped Street Furniture or he can upload the database on GIS map for planning.

The emphasis of Aerial Cable deployment in access Network is \r\n required in 5G . Pulling underground fibre to every cell site is practically \r\n not feasible due to cost, time, and logistical challenges. Aerial cable is \r\n typically, faster, and less expensive to deploy than digging, Environment \r\n challenges like lack of an underground telecom duct network.

5G Small Cells operate on higher frequency spectrum bands in the \\r\\n Range of FR1 band (sub 6 GHz) and FR2 band (mm Wave) that necessitate \\r\\n denser network deployments to support larger traffic volumes per unit area. \\r\\n The number of 5G small cells will therefore be huge in number as compared to the previous generation of 4G base station towers.

Permission letter will be provided by respective Department as per the ownership of street furniture.

To assist users, it has a dedicated 8x6 (Monday to Saturday) customer services call centre (from 10 AM – 6 PM), which supports ROW applicants and other stakeholders through a number (0755-2700802) and email (support@sugamsanchar.gov.in)

User can contact the defined help desk on the portal to put up a follow up request to the approving authority

Yes, it is the official letter with e-sign of the authority.

Yes, if the application is approved and all the fees are paid then approval letter will be released by the authority to be downloaded.

State Admin is the state/UT administrator to define and configure the system variables which will be used across system for the application processing.

Approving Authorities are the government officials who are designated for the application disposal.